Tri State Oil Tool Learning Center project, circa 1987. Preston at the controls while Manuel and Slim tail in a joint. After we set the 40” casing down to about 70’ we drilled a 36” hole 500’ deep and set 30” casing inside the 40” surface pipe.
Tri State Oil Tool Learning Center project, circa 1987. Preston at the controls while Manuel and Slim tail in a joint. After we set the 40” casing down to about 70’ we drilled a 36” hole 500’ deep and set 30” casing inside the 40” surface pipe.
by Phillip Talley | Jul 7, 2024